Design of Building Systems Is Systematically Sequenced and Interdisciplinarily Coordinated

6.2 Electrical Systems Design 6.2.1 Concept Design Phase 6.2.2 Schematic Design Phase 6.2.3 Design Development Phase 6.2.4 Construction Documents Phase

6.2.4 Construction Documents Phase

The electrical design team delivers the final version of lighting, power, ELV, earthing, and MV systems, including detailed diagrams, layouts, and calculations. Responsibilities include:

  • Final lighting, power, and ELV layouts per floor with circuit tagging and mounting heights
  • Updated single-line diagrams (SLDs), panel schedules, feeder sizing, and cable routing
  • Lightning protection, earthing, and emergency power system documentation
  • Final short circuit, voltage drop, and load calculations
  • Technical specifications and fully extracted BOQs for all electrical systems

Electrical consultants ensure that coordination with mechanical (e.g., equipment power supply), architectural (e.g., fixture mounting, switch heights), and civil/utility requirements is fully captured in the documents.

Tasks
1.0 Review Approved Schematic and Design Development Deliverables
2.0 Review Architectural and Mechanical Coordination Updates
3.0 Finalize Lighting System Drawings and Details
4.0 Finalize Small Power and Socket Layouts
5.0 Finalize ELV and Low Current System Layouts
6.0 Finalize Emergency Power and UPS Systems
7.0 Finalize LV Power Distribution System
8.0 Finalize Earthing and Lightning Protection System
9.0 Finalize Electrical Calculations and Load Summaries
10.0 Finalize Medium Voltage (MV) Utility Connection
11.0 Prepare Electrical Technical Specifications (CSI Format)
12.0 Prepare Electrical Bill of Quantities (BOQ)
13.0 Submit Complete Electrical Construction Document Package