Mechnical systems Schematic Design Phase
Mechnical systems Schematic Design Phase
Review Approved Concept Design and Feedback, Confirm Project Scope and Budget Alignment
Validate Site Fit and Orientation for Mechanical Systems, Refine Mechanical System Zoning and Layout
Perform Preliminary Mechanical System Sizing and Selection, Develop Mechanical System Diagrams and Control Strategies
Perform Energy and Sustainability Analysis, Prepare Mechanical System Design Drawings and Details
Prepare Mechanical System Technical Specifications, Prepare Mechanical Bill of Quantities (BOQ)
Prepare Mechanical Design Basis Report (DBR), Finalize Schematic Mechanical Design Submission Package
5.2 Mechanical Systems Design
5.2.1 Concept Design Phase
5.2.2 Schematic Design Phase
5.2.2 Schematic Design Phase
Mechanical engineers begin defining the mechanical systems conceptually and spatially, ensuring compatibility with the architectural vision. Key tasks include:
- Selecting preliminary HVAC system types and zoning strategies
- Estimating preliminary loads for HVAC, plumbing, and fire systems
- Identifying shaft requirements, plantroom allocations, and vertical service zones
- Defining locations for mechanical risers, equipment rooms, and major ducts/pipes
- Initiating coordination with architectural ceiling heights, floor zones, and structural systems
The mechanical schematic design aims to establish infrastructure viability while identifying early conflicts and spatial needs.
Tasks
1.0 Review Approved Concept Design and Feedback
2.0 Confirm Project Scope and Budget Alignment
3.0 Validate Site Fit and Orientation for Mechanical Systems
4.0 Refine Mechanical System Zoning and Layout
5.0 Perform Preliminary Mechanical System Sizing and Selection
6.0 Develop Mechanical System Diagrams and Control Strategies
7.0 Perform Energy and Sustainability Analysis
8.0 Prepare Mechanical System Design Drawings and Details
9.0 Prepare Mechanical System Technical Specifications
10.0 Prepare Mechanical Bill of Quantities (BOQ)
11.0 Prepare Mechanical Design Basis Report (DBR)
12.0 Finalize Schematic Mechanical Design Submission Package