Electrical System schematic Design Phase
Electrical System schematic Design Phase
Review Approved Concept Design and Updated Project Requirements, Refine Electrical Load Estimation
Define Primary Power Supply Scheme, Develop Preliminary Single-Line Diagrams (SLDs)
Define Electrical Room Requirements and Riser Zones, Define Emergency and Standby Power Systems
Define Earthing and Lightning Protection Systems, Develop Lighting System Design
Develop Small Power System Design, Develop ELV and Communication System Interfaces
Develop Power Distribution System Design, Prepare Outline Specifications for Electrical Systems
Prepare Schematic BOQ and Cost Estimate,Finalize Electrical Schematic Design Submission
6.2 Electrical Systems Design
6.2.1 Concept Design Phase
6.2.2 Schematic Design Phase
6.2.2 Schematic Design Phase
Electrical engineers focus on system concept development, space allocation, and infrastructure planning during schematic design. Their responsibilities include:
- Estimating electrical loads and confirming preliminary panel sizing and locations
- Planning riser routes, electrical rooms, and DB/SMDB/MDB positions
- Defining the lighting concept, emergency lighting provisions, and power zoning
- Identifying requirements for ELV systems (CCTV, data, access control, etc.)
- Allocating space for UPS, generator, transformer, and MV equipment
The schematic design phase for electrical ensures that spatial and functional provisions are incorporated early, avoiding costly relocations in later stages.
Tasks
1.0 Review Approved Concept Design and Updated Project Requirements
2.0 Refine Electrical Load Estimation
3.0 Define Primary Power Supply Scheme
4.0 Develop Preliminary Single-Line Diagrams (SLDs)
5.0 Define Electrical Room Requirements and Riser Zones
6.0 Define Emergency and Standby Power Systems
7.0 Define Earthing and Lightning Protection Systems
8.0 Develop Lighting System Design
9.0 Develop Small Power System Design
10.0 Develop ELV and Communication System Interfaces
11.0 Develop Power Distribution System Design
12.0 Prepare Outline Specifications for Electrical Systems
13.0 Prepare Schematic BOQ and Cost Estimate
14.0 Finalize Electrical Schematic Design Submission